PRESERVATION
PASADENA PUBLIC LIBRARY
Review cast stone restoration specification | revise as required
Develop specification for restoration + painting | including materials + execution of existing wood grand windows
Review clay tile roofing specification | revised as required for inspection, water testing + repair of existing roof system at lower shed roof
Provide on-site construction observation | assume six (6) site visits total
Witness + approve Contractor test panel of pressure washing procedures to ensure proper pressure at nozzle and technique
Witness + approve pointing procedures at Contractor test panel to ensure proper technique, mortar color, texture + contour
Witness + approve Contractor test panel of waterproofing material + application to ensure compliance with specification
Perform final inspection of Contractor’s work to ensure compliance with specifications
Perform final inspection of Contractor’s UV window film work to ensure compliance with specifications
Witness final water test of copper gutter system to ensure Contractor’s compliance with specifications
Develop specification for removal + replacement of existing UV film applied to interior grand windows
Develop specification for water testing + repair of existing internal copper gutter system above grand windows
PRINCIPAL | Dale Brown AIA
DESIGN LEAD | Steve Kuchenski AIA